Laserfiche WebLink
Elk River~~ a <br />Municipal Utilities ~ <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />May 2, 2005 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />John Dietz <br />Jim Tralle <br />From: Bryan Adams <br />Subject: Bids for installing U.G. Electrical Conductors <br />phone: 763.441.2020 <br />Fax: 763.441.8099 <br />The 2005 electric budget contains a $150,000 item to rebuild the electric system in <br />acquisition area 15. Part of this project we are doing with our own crews. Installing the <br />U.G. conductors we generally subcontract. On May 4, 2005 we received bids for <br />installing 18,000 LF U.G. electrical conductors for this project. A bid tabulation is <br />attached for your review. A staff recommendation will be made at our commission <br />meeting. <br />In preparation for the upcoming construction season, we have awarded other budgeted <br />projects that are less than the $50,000 threshold when this commission must award the <br />project. They are as follows; <br />Rebuild Fresno St. & Concord St. north and south of Co. Rd. 33 <br />12,400 LF @ $30,446 <br />Convert 194`x' Ave. from 2400 V to 12.46 Kv <br />4670 LF @ $16,524 <br />Rebuild Watson Street south of County Road 33 <br />4055 LF @ $10,075 <br />Rebuild Area 21 north of County Road 33 along city trail <br />6500 LF @ $6895 <br />We are currently out for bids for Belmont Estates which entails <br />6280 LF of conductor installation <br />In an effort to keep up with the mounting work load, our operational people will start 9 <br />hour days beginning May 9, 2005. This is normal for this time of year. <br />