Laserfiche WebLink
TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />S U BJ ECT: <br /> <br />*Item 3.3.* <br /> <br /> MEMORANDUM <br /> <br />Mayor and City Council <br /> <br />Lori Johnson, Finance Director <br /> <br />April 28, 2003 <br /> <br />Consider Public Safety Facility and City Hall/Utilities Change <br />Orders <br /> <br />The following change orders have been requested on the public safety and city hall building <br />projects. <br /> <br />Contractor <br /> <br />Bid Package Change Order Change Order <br />Number Number Amount <br /> <br /> PUBLIC SAFETY BUILDING <br />Serice Construction, Inc. <br />(Remove brick at curved wall ) <br />Steinbrecher Painting <br />(Delete wall for room 122) <br />Dryden Excavating, Inc. <br />(Lower drain tile for south elevator pit) <br />Daka Metal Fabricators <br />(Extra Lintel) <br />Schindler Elevator Corporation <br />(Relocate elevator #1 machine room) <br />Kelleher Construction <br />(Concrete blanketing at topping slab) <br />Regal Contractors <br />(Door changes in mechanical rooms) <br />Northern Air Corporation <br />(Deduction for part substitutions) <br />Total <br />Previously Approved <br />Total Change Orders to Date <br /> <br />10 1 $ (630.00) <br />26 1 (80.00) <br />1 2 1,000.00 <br />11 5 210.00 <br />39 1 2,300.00 <br />8 2 360.00 <br />13 1 429.00 <br />42 1 (1,048.00) <br /> <br /> 2,541.00 <br />42,569.00 <br />45,110.00 <br /> <br /> <br />