My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR Misc Issues 02-08-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
02-08-2005
>
ERMUSR Misc Issues 02-08-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2009 4:07:28 PM
Creation date
4/6/2009 4:07:28 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/8/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />February 2, 2005 <br />To: Elk River Municipal Utilities Commission <br />.Terry Takle <br />James Tralle <br />John Dietz <br />From: Bryan Adams <br />Subject: Miscellaneous Issues <br />phone: 763.441.2020 <br />Fax: 763.441.8099 <br />Enclosed is the packet for Tuesday, February 8, 2005 commission meeting at 4:00 p.m. <br />The City Council has reappointed Jim Tralle to another three year term on the Elk River <br />Municipal Utilities Commission, congratulations Jim. <br />It has been a number of years since the job positions in the office have been re-evaluated <br />from a comparable worth perspective. Many of the original job duties within particular <br />jobs have changed. Originally Hay Group evaluated these jobs and assigned points to <br />each position. Unfortunately, Hay Group has closed their Minneapolis offices. We can <br />either hire Hay Consultants to re-evaluate these positions or learn to do it ourselves. The <br />nearest Hay Job Evaluation Seminar is April 13 & 14, 2005 in Chicago. I would like to <br />attend unless this commission desires otherwise. Total cost is approximately $2500. <br />This will allow us the ability to utilize the Hay Group methodology in house instead of <br />paying consultants. <br />Enclosed is the following information for your review. <br />1) H.R. article from "Kiplinger Letter", dealing with Anti-body-piercing Hiles <br />discrimination based on personal appearance. <br />2) Graph reflecting Landfill Gas electric generation facility output for power and <br />energy for years 2003 and 2004. In 2004 this facility had a capacity factor of <br />102.17% fora $24,542.91 bonus to Waste Management. This facility was <br />ties <br />operating at peak capacity all 12 months at time of Great River Energy's <br />monthly peak. <br />
The URL can be used to link to this page
Your browser does not support the video tag.