My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. ERMUSR 01-11-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
01-11-2005
>
6.5. ERMUSR 01-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2009 3:36:05 PM
Creation date
4/6/2009 3:36:05 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
./j <br />ElkRiver ---~ <br />Municip al Utilitie s <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />December 22, 2004 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jim Tralle <br />John Dietz <br />From: Bryan Adams <br />Subject: Water Department Capital Purchases <br />phone: 763.441.2020 <br />Fax: 763.441.8099 <br />The 2005 water budget contains a number of capital items staff desires to implement. <br />The first is a $15,000 item to purchase a trailer mounted air compressor and hammers. <br />With a larger water system, the water department is doing many system maintenance <br />such as repair and raising valve boxes in the streets, repair and painting of valves, and <br />maintenance in filter plants all requiring a source of compressed air. Staff is proposing to <br />purchase the following. <br />185 CFM Ingersoll -Rand Diesel Driver Trailer Mounted Air Compressor <br />(see attached picture) <br />60# Pavement Air breaker with bits <br />45# Air Tamper <br />~0' Hose with fittings <br />Approximate cost $14,000 depending on hammer bits and air hose length <br />The 2005 budget contains a $50,000 item to initiate an aquifer storage and recovery <br />study. The concept behind Aquifer Storage and Recovery (ASR) is to treat water during <br />off peak (Oct. thru March) when we have treatment capacity and inject it back into the <br />aquifer (storage). During periods of high demand (summer months) this treated water <br />can be pulled back out of the aquifer (recovery), re-chlorinated and pumped into the <br />distribution system. The benefit is not building a water treatment facility at an <br />approximate cost of $1,000,000 fora 1000 gpm plant. The downside is we must pump <br />this water twice and chlorinate it tv`~ice at an additional cost of approximately $200/ <br />million gallons or $14,000 for 70,000,000 gallons/year. Additional $14,000/year to save <br />a $1,000,000 plant investment is a substantial savings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.