My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. ERMUSR 06-12-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
06-12-2007
>
5.5. ERMUSR 06-12-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2009 10:17:15 AM
Creation date
3/23/2009 10:17:15 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municip al Utilitie s <br />]3069 Orono Parkway <br />Elk River, MN 55330 <br />June 4, 2007 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />Jerry Takle <br />From: Bryan Adams <br />Subject: Well #9 Layout and Schedule <br />phone: 763.441.2020 <br />Fax: 763.441.80y9 <br />At the April 10, 2007, Elk River Municipal Utilities Commission meeting, authorization was <br />given to proceed with Well #9 at the Twin Lakes Estates location. Attached are the following <br />drawings for your review. <br />a) Location drawing <br />b) Site plan <br />c) Building floor plan <br />d) Landscaping plan <br />e) Three possible building elevation plans <br />The building is requiring us to go through the Conditional Use Permit (CUP) process with the <br />City. If all goes well, this process should conclude by July 16, 2007. I am currently visiting <br />with the adjacent property owners about this project. <br />The schedule for this project is as follows. <br />CUP approvals July 2007 <br />Earthwork & Utilities September 2007 <br />Construct Well Oct-Dec 2007 <br />Construct Building March 2008 <br />Mechanical & Instrumentation April 2008 <br />Landscaping & Asphalt April 2008 <br />Operational May 2008 <br />The cost of this project is estimated to be $650,000. If we spread the cost over two years, we <br />hope to pay for this facility with cash reserves, depending upon WAC fees collected in 2007. If <br />this cannot be done, equipment bonds for the well or MMTG bond pool can be utilized in 2008 <br />to finance a portion of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.