My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 04-05-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2007
>
04-05-2007
>
5.2. ERMUSR 04-05-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2009 2:45:26 PM
Creation date
3/19/2009 2:45:26 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River -~ <br />Municip al Utilitie s <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />Apri12, 2007 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />Jerry Gumphrey <br />Jim Tralle <br />From: Bryan Adams <br />Subject: Irving Water Main Project <br />phone: 763.441.2020 <br />Fax: 76344 t .so99 <br />Attached is a drawing reflecting the proposed Irving Avenue area water main project. <br />This project is being done in conjunction with the street rehabilitation project. The <br />original thought was to just replace the 4" water main on the 6t" St., 7`" St. and Gates <br />Ave. loop, but due to many old fire hydrants, the project was expanded to replace seven <br />additional hydrants. Considering St. Andrews Catholic Church facility expansion, <br />replacing the main on Irving Ave. between 4`" St. and St" St. was bid as an alternate. <br />The costs for the water main portion is as follows. <br />Water main & hydrants $174,392.50 <br />Irving Ave. alternate for St. Andrews $31,571.OC <br />Engineering & inspection approximate $20,000.00 <br />$225,963.50 <br />2007 Budget allowance $100,000.00 <br />I have contacted St. Andrews about cost sharing their portion of the work, but they <br />indicated no interest in cost sharing. <br />Staff recommends proceeding with this project with the additional funds coming from <br />reserves. <br />
The URL can be used to link to this page
Your browser does not support the video tag.