My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 11-13-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2008
>
11-13-2008
>
6.1. ERMUSR 11-13-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2008 3:41:13 PM
Creation date
12/15/2008 3:41:13 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~/ <br />Elk River -== <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />November 6, 2008 <br />To: Elk River Municipal Utilities <br />Jerry Takle <br />John Dietz <br />Jerry Gumphrey <br />From: Theresa Slominski <br />Subj: Proposed 2009 Expense Budget <br />b.l <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />Attached are the proposed 2009 electric and water expense budgets for your review. All items <br />remain the same but the capital projects amounts have changed as follows. <br />1. The vehicle purchase for administration was removed and the shared cost of that affected <br />both budgets. <br />2. Water -The bid for the trunk main extension to complete the loop from the 193`d road <br />extension came in significantly less than what projections were. We had originally <br />projected $120,000 and were anticipating the bids exceeding this amount, but the bid <br />came in at $86,000 (agenda item 6.3). <br />3. Water -The street rehabilitation projects leave the 4" mains in service and upgrade or <br />move the necessary hydrants for fire protection at a cost of $32,500. <br />The changes identified above impact the electric budget with placing $489,751 to reserves and <br />the water budget with placing $58,837 to reserves. <br />Attached is an updated spreadsheet for the cash and reserves projections. Items that have been <br />updated are the 2008 projections and the 2009 budget; all other assumptions have remained the <br />same. The spreadsheet utilizes projections and assumptions that staff will need to gain a better <br />understanding of before attempting to change. We believe that as we work with RW Beck in our <br />proposed rate analysis it will-help us to obtain that~understanding. That being said, the <br />spreadsheet does identify that we are moving in the right direction for reaching our reserve goals <br />for electric and water and we should be able to replenish our water reserves to the 2007 levels in <br />five years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.