Laserfiche WebLink
ilk REQUEST FOR ACTION <br />.~.. <br />River <br />To Item Number <br />Plannin Commission 6.2 <br />Agenda Section Meeting Date Prepared by <br />Plannin Items December 9, 2008 erem Barnhart, Plannin Man er <br />Item Description Reviewed by <br />Update -Focused Area Study (FAST Study), 175' Avenue Area <br /> Reviewed by <br />Action Requested <br />On December 15C, the City Council enacted a 6-month moratorium to allow the City, including EDA, <br />Planning Commission, and City Council, to complete a land use plan for the area shown on the attached <br />map. To complete this study, (internally named Focused Area Study (FAST), the EDA has retained the <br />services of Hoisington Koegler Group, Inc., which is expected to take 5 months. <br />The hope of the plan is to capture and leverage the interest surrounding the Northstar Commuter rail and <br />the City owned Gateway property while re-evaluating the land use direction in the area. <br />The EDA serves as the property owner for this project, although there are several meeting with the <br />EDA/ CC/ and PC incorporated into the planning process. These meetings are joint meetings, and are <br />expected to occur on the second Monday of each month, at the EDA meeting. The EDA meets at 5:30. <br />Once the EDA approves the contract and scope, I will forward a copy to the Commissioners. <br />Additional information will be provided at the meeting. <br />S:\PLANNING MAIN\Case Files\OA\OA 08-11 175th Study Moratorium\Update to PC 12-9-08.doc <br />