Laserfiche WebLink
tkiver <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br /> MEMORANDUM <br /> <br />Mayor and City Council <br /> <br />Lori Johnson, Finance Director <br /> <br />January 13, 2003 <br /> <br />Consider Public Safety Facility Change Orders <br /> <br />Item 4.3. <br /> <br />The following change orders have been requested on the public safety building. Most of thc <br />items are minor construction changes. The large items include additional storm sewer pipe, <br />the addition of a water softener system, and thc deletion of infra-red heating in thc fire <br />station bays. <br /> <br /> Bid Package <br />Contractor Number <br /> <br />Dryden Excavating <br />Kelleher Construction <br />Daka Corporation <br />Daka Corporation <br />Western Steel <br />George F. Cook Construction <br />Northern Air Corporation <br />Sentra Sota Sheet Metal <br />Sentra Sota Sheet Metal <br />Collins Electrical <br />Total <br />Previously Approved <br /> <br />Total Change Orders to Date <br /> <br />11 <br />12 <br />14 <br />4O <br />43 <br />43 <br />45 <br /> <br />Change Order <br />Number <br /> <br />5 1 <br />8 1 <br />11 1 <br /> 2 <br /> 1 <br /> 2 <br /> <br />Change Order <br />Amount <br /> <br />10,650.00 <br />280.00 <br />1,922.00 <br />115.00 <br />2,188.00 <br />4,498.00 <br /> <br /> 14,997.00 <br />(10,641.00) <br /> 178.00 <br /> 954.00 <br /> <br />25,141.00 <br /> 5,902.00 <br />31,043.00 <br /> <br />Attached is a budget summary for the public safety project that includes these change orders. <br />The project is still well under budget with these change orders. <br /> <br />Action Requested <br />The City Council is asked to approve the change orders as noted above. <br /> <br /> <br />