Laserfiche WebLink
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 6.2. <br />Agenda Section Meeting Date Prepared by <br />Public Works Ma 5, 2008 Tex Maurer, Public Works Director <br />Item Description Reviewed by <br />Resolution Accepting Bid and Authorizing Execution of Lori ohnson, City Administrator <br />Contract in the Matter of the Jackson Avenue/School Street Reviewed by <br />Intexsecdon Improvement <br />Action Requested <br />Adoption of the attached resolution accepting the bid and authorizing the execution of the <br />contract fox the Jackson Avenue/School Street intersection improvement. <br />Background/Discussion <br />The City Council authorized the advertisement fox bids at your March 17, 2008 meeting. Bids <br />were opened on Tuesday, April 15. There were a total of five bids received. A copy of the bid <br />tabulation is attached and the following table lists the five bidders and their total bids. <br />Bidder Bid Amount <br />W.B. Miller, Inc. $110,977.17 <br />Desi Electric, Inc. 113,406.00 <br />North Valle ,Inc. 116,118.18 <br />Forest Lake Contxactin ,Inc. 118,168.99 <br />Haxdrives, Inc. 120,447.03 <br />As a xexnuidex, the improvement includes adding left turn arrows to southbound Jackson Avenue <br />and westbound School Street. In addition, it includes adding a right turn lane fox southbound <br />Jackson Avenue. These improvements require the moving of the signal pole in the northwest <br />corner of the intersection, along with the control panel at that location. An easement was <br />necessary from the School District to facilitate the construction of the right tum lane and the <br />moving of the signal equipment. The easement has been received from the School District. <br />It is impartant to note that the existing signal will be out of operation fox a few weeks as the <br />improvements axe completed. During that time, the intersection will operate with afour-way stop <br />sign control. To obtain a cost, we bid as an alternate, a temporary signal system in lieu of an all- <br />way stop sign control. The alternate bid cost is $23,500. We believe the intersection will operate <br />safely and effectively duxuig construction with stop signs; therefore, we axe not recommending <br />the award of the temporary signal system. <br />W.B. Miller, Inc. has previously successfully completed similar projects in the City of Flk River. <br />Therefore, we would recommend award to them as the lowest responsible bidder. <br />