My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 04-14-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
04-14-2008
>
5.1. SR 04-14-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2008 8:26:46 AM
Creation date
4/11/2008 9:49:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item # 5.1. <br />MEMORANDUM <br />TO: Mayor and City Council <br />Housing & Redevelopment Authority <br />FROM: Terry Maurer, Public Works Director <br />DATE: April 14, 2008 <br />SUBJECT: THIO and TH169 Geometric and Environmental Studies <br />Representatives of MnDOT and their consultant, SRF Consulting Group, will be at tonight's <br />workshop to discuss both TH10 and the TH169 studies. With the TH10 srudy, they will be <br />providing the Council with two alternatives that they have developed, based on the <br />constraints of the study area. The first will be an ex-pxessway design with signalized <br />intersections; the second will be a freeway design with interchanges to access the highway. <br />Both designs will have grade-separated roadways from the railroad. With xegaxd to the <br />TH169 study, the outstanding issue is the intersection/interchange at Main Street. All other <br />intersections have been previously reviewed with the City Council. The two alternatives that <br />they will present at TH169 and Main Street axe the folded diamond and the single-point <br />interchange. 'They have been "tweaked" based on comments received from the Council last <br />time MnDOT and SRF were here. <br />MnDOT and their consultant will be looking fox direction with xegaxd to what concept the <br />Ciry Council would like to see move forward to layout and environmental documentation on <br />TH10 and which interchange design the Council would like to see included ui the TH169 <br />layout and environmental documentation. It is important that the Council give direction to <br />MnDOT so that these two projects can not only stay on schedule, but more importantly stay <br />on budget. <br />Finally, it is important to note that the Sherburne County Board will also be invited to this <br />meeting since TH 10 and '1'H 169 are important transportation corridors within Sherburne <br />County. <br />S:\EnpneexImprovProj\2007 Improvement Projects-\T'Id 169 Study\04 l4 OS 10 & ]69 Studies doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.