My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 4-15-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
04/15/2002
>
5.2. SR 4-15-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:00 AM
Creation date
12/16/2002 9:07:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> <br />Item ~ 5.2. <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Mayor and Council <br /> <br />Bruce West, Fire Chie <br /> <br />April 22, 2002 <br /> <br />Consider Bids for Refinishing Fire Station Floors <br /> <br />The Elk River Fire Department, within its 2002 budget has a line item for the refinishing of <br />the fire station floors. At this time, I would like to review with the Mayor and Council the <br />background information referencing this issue. <br /> <br />The original station is now 30 years old and the floor and some of the drains are in dire need <br />of refinishing. There are numerous areas where the concrete has chipped and cracked from <br />every day wear and tear. There are three drains that have been completely cut out and <br />replaced from the concrete breaking away. The Elk River Public Works Department and <br />members of the Elk River Fire Department have taken on the replacement drain concern <br />and completed the necessary repairs. <br /> <br />I have contacted three floor concrete refinishing companies to come to the fire station and <br />look at the floor refinishing and submit a bid for the project. The following bids were <br />received: <br /> · QC Companies, Ham Lake, MN $23,140 <br /> · Pro-Maintenance, Hutchinson, MN $26,372 <br /> · Diversified Coating, Fridley, MN $25,868 <br /> <br />Fire Department members have reviewed the quality and workmanship of all three bidders <br />by visiting fire stations around the Metro area to see first-hand the completed floors. The <br />specifications of all three bidders are comparable and acceptable to the members of the Fire <br />Department. The Elk River Ambulance has agreed to fund up to $3,000 towards the <br />concrete refinishing project. The Fire Department funding is designated from the $22,500 <br />FEMA funds set aside from the Disaster Reimbursement Funding received in 2001. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.