My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 03-17-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
03-17-2008
>
7.2. SR 03-17-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2008 1:09:51 PM
Creation date
3/14/2008 1:09:51 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 7.2. <br />Agenda Section Meeting Date Prepared by <br />Public Works Mazch 17, 2008 T Mauxex, Public Works Director <br />Item Description Reviewed by <br />Authorize Bid fox Jackson Avenue/School Street Intersection Loxi ohnson, Ci Administrator <br />Improvements Reviewed by <br />Action Requested <br />Consider adoption of resolution approving plans and specifications and ordering the <br />advertisement for bids for the Jackson Avenue/School Street intersection improvements. <br />Background/D iscussio n <br />The City authorized preparation of plans and specifications fox the Jackson Avenue/School <br />intersection improvements in April 2002 The improvements include adding left turn arrows to <br />southbound Jackson Avenue and westbound School Street. In addition, the improvement <br />includes constructing a right rum lane on southbound Jackson Avenue. This will necessitate <br />relocating one signal pole, the signal control box, and installing a longer mast arras. <br />Once the plans were nearly complete, the project was put on hold as the City Council worked <br />through a formal five-year Capital Improvement Program (CIP) and had a joint meeting with the <br />school district, at which this intersection improvement was discussed. <br />The resolution authorizing the advertisement for bids anticipates that the project will be <br />constructed in the summer of 2008 when school is not in session. It is important to note that <br />there will be a period of time (four weeks or longer) that the signal will not be operational, as the <br />control panel and signal base is moved in the northwest corner; until such time that the mast arm <br />and improvement is complete and the signal is xestazted. During the time that the signal is not <br />operational, a temporary four-way stop control will be utilized. <br />Financial Impact <br />There is $350,000 identified in the 2008 CIP fox this improvement project. <br />Attachments <br />Resolution Approving the Plans and Specifications and Ordering the Advertisement fox <br />Bids <br />
The URL can be used to link to this page
Your browser does not support the video tag.