My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 03-11-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
03-11-2008
>
5.1. PCSR 03-11-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2008 8:58:55 AM
Creation date
3/14/2008 8:55:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/11/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'' Elk\~~--~-~ REQUEST FOR ACTION <br />ver <br />To Item Number <br />Plannin Commission 5.1 <br />Agenda Section Meeting Date Prepared by <br />Planning Items March 11, 2008 Sheila Cartney, Senior Planner <br />Item Description Reviewed by <br />Request by Great River Energy for a building addition case# erem Barnhart, Plannin Mana er <br />CU 08-05 Reviewed by <br />Action Requested <br />Staff recommends that the Planning Commission recommend approval of the Conditional Use <br />Permit for a building replacement, as illustrated on drawings dated received February 26, 2008, with <br />the following conditions: <br />1. All comments of the City Engineer's memo dated February 27, 2008 shall be <br />addressed. <br />2. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all <br />require permits. <br />3. A NPDES permit is required prior to final approval of construction drawings. <br />4. Parking lot landscape be installed as illustrated. <br />5. Any trees removed for the fire lane shall be replaced on site. <br />Bac kgrou nd/Discussion <br />Amcon Construction is proposing to replace an existing high bay garage area, parking area, and office <br />area, with a 43,000 square foot building of the same nature. This is an update for Great River Energy's <br />campus in Elk River. <br />Attachments <br />• Location Map <br />• Memo from City Engineer dated February 27, 2008. <br />• Applicant's Narrative <br />• Site Plan(s) dated received February 26, 2008 <br />• Architectural Drawing(s) dated received February 26, 2008 <br />General Information <br />
The URL can be used to link to this page
Your browser does not support the video tag.