My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. PCSR 06-12-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2007
>
06-12-2007
>
5.6. PCSR 06-12-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 3:48:47 PM
Creation date
2/11/2008 10:46:07 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Plannin Commission 5.6. <br />Agenda Section Meeting Date Prepared by <br />Plannin Items une 12, 2007 erem Barnhart, Plannin Mana er <br />Item Description Reviewed by <br />Request by Riverside Companies for an Interim Use Permit for Scott Clark, Community Development <br />Spectrum High School, a Charter High School Director <br /> Reviewed by <br />Action Requested <br />Staff supports a Planning Commission recommendation of approval for an interim use permit, as <br />illustrated on drawings dated 4/30/2007 and revised 6/6/2007, with the following conditions: <br />1. All comments of the City Engineer's memo dated June 7, 2007 shall be addressed. <br />2. All comments and conditions of the Sherburne County memo dated May 11, 2007 <br />shall be addressed. <br />3. The development of the site shall meet all applicable fire codes. The Fire Chief shall <br />verify the location of all fire hydrants, and may require additional hydrants necessary <br />to preserve the health and safety of the residents. <br />4. A wetland buffer of 25 feet apply to all wetlands and a structure setback of 20 feet <br />from the buffer applies. <br />5. A NPDES permit is required prior to construction. <br />6. A letter of credit in the amount of 100% of the cost of the landscape, site stabilization <br />improvements, to a maximum of $50,000 shall be submitted prior to the releasing of <br />the Building permit. <br />7. Interim Use Permit shall expire on July 1, 2010. <br />Background/Discussion <br />Spectrum High School received an interim use permit in 2006 allowing the school to operate at the Elk <br />River Boy and Girls Club unti12010. The Spectrum High School census has increased faster than <br />anticipated, and the need a long term solution. <br />Spectrum High School seeks an interim use permit to operate their school in modular buildings on site of <br />their anticipated permanent home. The modular units will be used to continue to grow the enrollment, <br />along them to use state funding mechanisms to finance the permanent structure. The interim use permit <br />is requested for 3 years, July 1, 2010. Further information regarding the financing plan will be provided at <br />the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.