Laserfiche WebLink
RESOLUTION 07- 99 <br /> <br />A RESOLUTION. FOR THE CITY OF ELK RIVER <br />A RESOLUTION FOR THE CITY OF ELK RIVER <br />ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE <br />MATTER OF THE BITUMINOUS OVERLAY IMPROVEMENT OF 2008 <br />• <br />WHEREAS, the City has determined that it should consider improving certain. property by <br />providing a bituminous overlay (the Improvement) in the locations shown on the <br />attached exhibit; and <br />WHEREAS, Council must first secure a preliminary feasibility report in order to consider making <br />the improvement <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, <br />Minnesota: <br />This matter shall be referred to Terry Maurer, City Engineer, who is requested to provide to <br />the City Council a report advising, in a preliminary way, whether the proposed improvement <br />is feasible and whether the improvement should thus be made as proposed or in connection <br />with some other improvement and the estimated cost of the improvement as recommended. <br />Passed and adopted this 3`d dap of December, 2007. <br />ATTEST: <br />Tina Allard, City Clerk <br />~Q <br />Stepp nie Klinzing, May <br />• <br />