My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-031 RES
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
2000 - 2009
>
2007
>
026-050
>
07-031 RES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:34:08 PM
Creation date
3/1/2007 11:01:57 AM
Metadata
Fields
Template:
City Government
type
RES
date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />RESOLUTION 07-21- <br /> <br />A RESOLUTION OF THE CITY OF ELK RIVER <br /> <br />A RESOLUTION APPROVING THE CONSTRUCTION <br />OF A 150-200 MW SIMPLE-CYCLE PEAKING PLANT FUELED PRIMARILY <br />BY NATURAL GAS WITH FUEL-OIL BACK-UP <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />WHEREAS, <br /> <br />Great River Energy (GRE) plans to construct a 150-200 MW sirnple- <br />cycle peaking plant fueled primarily by natural gas with fuel-oil back-up <br />(the "Project"); and <br /> <br />GRE has identil1ed a site in the City of Elk River (the "City") where <br />GRE has an existing 230 kV substation and a RDF-fIred generating plant <br />as a leading site for the proposed Project due to the proximity of high <br />voltage transmission lines, natural gas pipelines, and compatible land <br />uses; and <br /> <br />prior to construction, the Project will need to be issued a Certificate of <br />Need and Site Permit from the Minnesota Public Utilities Commission, <br />and an Air Permit from the Minnesota Pollution Control Agency; and <br /> <br />the Project will provide wholesale electricity to benefit primarily GRE's <br />28 member electric cooperatives, including Connexus Energy, which <br />provides electricity to Elk River Municipal Utilities; and <br /> <br />the Project will provide significant jobs during construction; and <br /> <br />the Project is expected to pay real estate taxes; and <br /> <br />in order for GRE to proceed with the development of the Project in Elk <br />River, the annual taxation of the Project will need to be comparable with <br />other existing or proposed peak electric generation facilities within the <br />state; and . <br /> <br />under current law, the Project would have to pay approximately $1.06 <br />million in its first year due to property taxes on electrical generation <br />equipment, in addition to approximately $310,000 in real estate taxes and <br />personal property taxes on natural gas and transmission line upgrades; <br />and <br /> <br />the Legislature has granted personal property tax exemptions to more <br />than two dozen proposed power plants in Minnesota since 1994 and, as a <br />result, personal property exemptions are critical to be competitive with <br />other existing and proposed plants that have received an exemption in <br />Minnesota; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.