Laserfiche WebLink
<br />~ <br /> <br />~ <br /> <br />_ <br /> <br />MS'l <br /> <br />COlS[LTI~G R~mEEltS <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAL <br /> <br />MUNICIPAL <br /> <br />PLANNING <br /> <br />STRUCTURAL <br /> <br />_ SURVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORT A nON <br /> <br />1326 Energy Pork Drive <br />51. Paul, MN 55108 <br />612-644-4389 <br /> <br />Fox: 612-644-9446 <br /> <br />9800 Shelard Parkway <br />_MinneapoliS, MN 55441 <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />AGENDA ITEM 8.7 <br /> <br />April 27, 1994 <br />File: 230-219-10 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: PETERSON ADDITION/GREENHEAD ACRES 2ND ADDmON <br />BITUMINOUS OVERLAY <br /> <br />Dear Mr. Klaers: <br /> <br />As directed by the City Council, we have prepared the attached feasibility study for the <br />bituminous overIayment of the existing streets in the Peterson Addition and the Greenhead <br />Acres 2nd Addition. As you are aware, this was a project initiated by the City Council based <br />upon the recommendation of Phil Hals, the City Street Superintendent. The proposed <br />improvement consists of providing a bituminous overIayment of the existing streets within <br />.these two developments. According to the City's assessment policy, the entire cost is <br />proposed to be assessed against the benefitting properties on a per lot basis. The estimated <br />assessment rate is $1,557 per lot. <br /> <br />In order to proceed with this project, the City Council would need to consider the attached <br />resolution which accepts the feasibility study and orders the public hearing. Since this <br />project was initiated by the City Cou.ncil an~ not by petition of the affected property owners, <br />the attached resolution requires a 4/5 vote for the project to proceed. We have tentatively <br />scheduled the public hearing for the June 6, 1994, City Council meeting. <br /> <br />If you have any questions regarding this information, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />T5~~ <br /> <br />TJM:tp <br />Attachment <br /> <br />219-2703.apr <br />