My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 04-21-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
04/21/1994
>
4.4. SR 04-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:34 AM
Creation date
9/26/2006 3:30:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.MS ~ <br /> <br />CONSULTING ENGINEERS <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAl <br /> <br />MUNICIPAl <br /> <br />PlANNING <br /> <br />STRUCTURAl <br /> <br />_URVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORTATION <br /> <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-.4389 <br />Fax: 612-644-9.4.46 <br /> <br />.800 Shelard Parkway <br />Minneapolis, MN 55441 <br /> <br />612- 5.46-0.432 <br />Fax: 612-544-6398 <br /> <br />ITEM 4.4. <br /> <br />April 15, 1994 <br />File: 230-151-30 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: WWTP INTERIM UPGRADE <br /> <br />Dear Council Members: <br /> <br />On April 14, 1994, we opened the bids for the Wastewater Treatment Plant Interim Upgrade. <br />The results of the bids are tabulated as follows: <br /> <br />Gridor Construction, Inc. <br />ABE Construction Company <br />Rice Lake Contracting <br />Madsen Johnson Corporation <br />Lametti & Sons, Inc. <br /> <br />$ 918,500 <br />924,000 <br />960,000 <br />997,600 <br />1,013,670 <br /> <br />Our engineering estimate for the project was $1,000,000. The lowest bidder was Gridor <br />Construction, Inc. , whose bid was about 8 % lower than our estimate. Gridor <br />Construction, Inc., has completed more than 20 wastewater treatment facility construction <br />projects in the past 10 years. The references we checked indicated that the Contractor is <br />competent to do the work and their performance has been satisfactory. <br /> <br />The intent of the wastewater interim upgrade is to build part of the planned major <br />upgrading of the treatment plant this year in order to compensate the failure of one of the <br />main treatment facilities at the existing plant. This construction is necessary to bring the <br />plant in compliance with the effluent discharge standards required by the Minnesota <br />Pollution Control Agency. <br /> <br />151-1502.apr <br />
The URL can be used to link to this page
Your browser does not support the video tag.