My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 08-07-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
08/07/2006
>
6.2. SR 08-07-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:30 AM
Creation date
8/3/2006 4:21:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/7/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of Elk River Item Number <br />REQUEST FOR COUNCIL ACTION 6.2. <br />Agenda Section I Meeting Date Prepared by <br />..A. dminis tra tion .L\ugust 7, 2006 Bill1\1aertz, Parks and Recreation Director <br />Item Description Reviewed by <br />.L\uthorization to i\svard Contract for Neigllborllood Park <br />Proj ects <br /> <br />Introduction <br /> <br />Audlorization to .L\\vard Contract far NeigIlbarhaad Park Projects. <br /> <br />Discussion <br />TIle 2006 park impro'vement budget included neigllborllood park projects at l<leiver Lake Fields, <br />rvleado\\rvale Heigllts and a trail connection in I(liev"'er Park Pointe. Council aUdl011.zed staff to ad'Tertise <br />for bids on June 1,2006. Tluee bids \vere received; one \vas rejected for being incomplete. TIle lo\v bid <br />\vas $263,296 by 'l eit and COlnpany, Inc. of Rogers, ~vfN. TIle engineers estimate \vas $222,000 including <br />a conungency. <br /> <br />In preparing estimates, engineering staff took a\rerage unit costs from 2005 and added an inflation factor. <br />Staff Ilas analyzed the bid results, and dle unit costs dlat came in higller tllan dle estimate \vere related to <br />grading and trail preparation. Tllese acti'Tities in,Tol,Te l1eav}i equipment and therefore are subject to <br />increased fuel costs. Staff belie'Tes that \ve received cOlnpetiti'Te bids and that tlle cost of these projects <br />\vill only increase if delayed until tlle future. <br /> <br />Financial Impact <br />$263,296 from park dedication fund. TIle funds current balance is $1,741,951. <br /> <br />Attachments <br />· Bid Tabulation <br />· Project Location IvIap <br /> <br />Action Requested <br />1\utl1orization to a\vard contract for neighborhood park projects to \1 eit and Company Inc. of Rogers, <br />IvIN. <br /> <br />Council Action <br /> <br />ivfotion by _ <br /> <br />Second by _ <br /> <br />\Tote <br /> <br />Follow Up <br /> <br />C:\Documents and Scttings\tallard\Local Settings\Temporary Internet Filcs\OLKF\G2 ..:'\uthor to ~\ward (2).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.