My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 03-07-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
03/07/1994
>
5.2. SR 03-07-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:28 AM
Creation date
8/3/2006 12:46:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/7/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rei ---\) <br />( )j <br />'Ii< <br /> <br />A!!enda Item 5.2. <br /> <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />MAYOR & CITY COUNCIL 1'/ <br />PATKLAERS,CITYAD~~.,!' ATOR <br />rf'! <br />MARCH 2, 1994 :r/ <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: HIGHWAY 101/169/10 MNDOT <br />COOPERATIVE AGREEMENT <br /> <br />Attached for your information is a cover letter from City Engineer Terry <br />Maurer regarding the MnDOT Cooperative Agreement, a resolution <br />approving this agreement, and the actual MnDOT/City agreement. Also <br />attached are some maps showing the drainage improvements that are being <br />discussed in the agreement. <br /> <br />e <br /> <br />Terry Maurer is out of town on vacation and I have asked one of his <br />employees, Dave Nyberg, to attend this meeting to review the proposal with <br />the City Council. Dave has been working with MnDOT on behalf of the City <br />in the development of the drainage improvements plans. <br /> <br />The improvements call for the construction of a new 72 inch culvert through <br />the intersection and into a drainage pond. Improvements also call for the <br />reconstruction of an existing drainage pipe. This reconstruction is for a 60 <br />inch pipe on the west side of the project that would flow into an existing <br />drainage pipe and into the drainage pond. <br /> <br />e <br /> <br />When this agreement was first received last week, I had some concerns over <br />the cost associated with the 60 inch pipe and whether or not the City was <br />paying a disproportionately large share for this pipe. Initially, the City <br />understood that MnDOT needed to upgrade this pipe anyway and this was <br />part of the initial discussions. However, the final design for the 72 inch pipe <br />on the other side of the intersection did not flow into the existing 60 inch <br />culvert pipe, but was a completely separate drainage pipe into the pond. <br />Based on this design, MnDOT had no need to upgrade anything on the west <br />side of the intersection. With this being the case, most of the cost to upgrade <br />this existing 48 inch and 36 inch pipe to the 60 inch pipe on the west side <br />becomes a City responsibility. This 60 inch pipe is to drain all of the area <br />that flows from the Main and Evans intersection that is scheduled to be <br />improved in 1994. <br /> <br />P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.