My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 05-08-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
05/08/2006
>
5.2. SR 05-08-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:59 AM
Creation date
5/4/2006 2:36:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/8/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Item 5.2. <br /> <br />13065 Orono Park-way <br />Elk River. MN 55330 <br /> <br />May 8, 2006 <br /> <br />The Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, Iv1N 55330 <br /> <br />RE: 'TRANSPORTATION PROJECTS <br /> <br />Dear Council Members: <br /> <br />An update of the various transportation projects has been scheduled for the Monday, May 8, <br />2006 City Council worksession. One of the specific items that was requested to be updated <br />is the Jackson Avenue/School Street signalization and intersection geometries issue. Since I <br />v.rill be in attendance to provide information regarding this proposed project, I thought I <br />would take this opportunity to provide at least a written update of all other transportation <br />issues including projects currently under contract, projects in the plming stage, and projects <br />being coordinated by other entities. These updates are as follows: <br /> <br />1. Dodge Avenue/Waco Street Improvement <br /> <br />Construction began on Dodge Avenue approximately t\Vo weeks ago. The contractor is <br />very near placing the new concrete curb and gutter which v.rill be followed by the gravel <br />base and first lift of blacktop. We would anticipate that the roadway will be back in a <br />hard surface format in the next week or two. In approximately two weeks, the <br />contractor will move to Waco Street and work v.rill begin on that portion. <br /> <br />2. School Street/High School Parking Lot Signalization <br /> <br />The contract for this project has been awarded and the material has been ordered. A <br />preconstruction meeting v.rill be scheduled for the latter part of May so that construction <br />is ready to begin as soon as the school year is over. Construction will consist of some <br />minor improvements to the high school parking lot driveway entrance, placement of <br />concrete bases for the signal poles, and the necessary wiring. As with all signal projects, <br />this work will be done and in place long before the signal equipment will arrive at the <br />site. Once the signal equipment is available, it v.rill take approximately two days for the <br />signal to be installed and operational. Weare very hopeful that the equipment will arrive <br />and the signal can be operational before the beginning of the fall school year. <br /> <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br /> <br />www.ci.elk-river.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.