My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 07-08-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025
>
07-08-2025
>
6.1g ERMUSR 07-08-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 1:01:04 PM
Creation date
7/7/2025 1:01:03 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Mike Tietz - Technical Services Superintendent <br />MEETING DATE: <br />July 8, 2025 <br />AGENDA ITEM NUMBER: <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br /> <br />DISCUSSION: <br />• In June, the locators processed 540 locate tickets. These consisted of 450 normal tickets, <br />2 emergency tickets, 60 updated tickets, 9 meetings, 2 planning, 4 boundary surveys, <br />and 13 cancellations. This resulted in a 4.6% decrease in tickets from the previous <br />month and a 25.9% increase from the prior June. <br />• In June, the electrical technicians completed 467 service order tasks, updated the power <br />bill, addressed customer meter issues and any off-peak concerns. <br />• The AMI residential water meters and residential electric meters continue to be <br />installed in new services. The electrical technicians have been busy changing out AMR <br />meters to AMI meters for small non-demand commercial customers. We did receive <br />some of our RMA/Warranty meters back from Sensus. We have approximately 5,532 <br />(97%) water meters and 12,441 (88%) electric meters that are installed within the <br />system. Overall, the AMI project is approximately 91% completed. <br />• Review of foundation drawings for East substation have been completed and contract <br />documents for concrete work has been released for bids. The fencing contractor will <br />begin installation in August and will return to complete the remaining fence work after <br />the foundations have been poured. <br />• We have been working with WEG on the East transformer’s Load Tap Changer (LTC) to <br />make sure it matches the Otsego transformer. Conduit and ground grid installation will <br />take place early this winter, with assembly of the structures being built over the winter <br />by ERMU staff. Commissioning of the substation should be completed by September 1. <br />• Our monthly peak was 66.15 MW on June 22, at 4:50pm. <br />87
The URL can be used to link to this page
Your browser does not support the video tag.