Laserfiche WebLink
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Mike Tietz – Technical Services Superintendent <br />MEETING DATE: <br />June 3, 2025 <br />AGENDA ITEM NUMBER: <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br /> <br />DISCUSSION: <br />• As of May 28, the locators processed 506 locate tickets. These consisted of 421 normal <br />tickets, 1 emergency ticket, 55 updated tickets, 4 meetings, 3 planning, 10 boundary <br />surveys, 3 corrections, and 9 cancellations. This resulted in a 2.2% increase in tickets <br />from the previous month and a 16.4% decrease from the prior May. <br />• To date, the electrical technicians have completed 515 service order tasks, updated the <br />power bill, addressed customer meter issues and any off-peak concerns. <br />• The Advanced Metering Infrastructure (AMI) residential water meters and residential <br />electric meters continue to be installed in new services. The electrical technicians have <br />been busy changing out the old Automated Meter Reading meters to AMI meters for <br />small non-demand commercial customers. We received our shipments of 4S, 3S, and 2S- <br />320 amp electric meters from Sensus and I have been told that our RMA/Warranty <br />meters should be shipping back to us sometime in June. We will be exchanging those <br />meters as time allows. Approximately 5,413 water meters and 12,208 electric meters <br />are currently active within our AMI system. <br />• Staff completed the changing out all the capacitor bank controllers. <br />• Our monthly peak was 63.14 MW on May 14, at 4:40pm. <br />203