My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 05-19-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
05-19-2025
>
10.1 SR 05-19-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 10:40:19 AM
Creation date
5/29/2025 10:40:19 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community <br />engagement that encourages and inspires prosperity <br /> <br />Request for Action <br /> <br />To <br />City Council <br />Item Number <br />10.1 <br /> <br />Meeting Date <br />May 19, 2025 <br />Prepared By <br />Joe Stremcha, Business Services Director/Assistant <br />City Administrator <br /> <br />Item Description <br />FT Center Field House Improvements <br />Reviewed by <br />Katie Harstad <br />Cal Portner <br />Tina Allard <br /> <br />Action Requested <br />Staff will provide an overview of the proposed field house improvements and be available to answer questions. <br /> <br /> <br />Background/Discussion <br />The primary source of funding is a result of the American Rescue Plan Act (ARPA) revenue replacement for <br />the FT Center due to the negative impacts of COVID. The City has $405,000 earmarked for field house <br />improvements. The project is not supplemented with any property or sales tax revenue. Staff sought <br />$500,000 through the Minnesota Multi-Purpose Community Facility Projects FT25 Grant, but our project was <br />not awarded. <br /> <br />Staff solicited quotes for the following: <br /> <br />Concrete floor 196' x 114' beneath turf: <br />▪ Remove 4" of the existing gravel base <br />▪ Form and pour 4" of 4500 PSI concrete with fiber mesh, <br />▪ Smooth finish <br />▪ Place control joints <br />▪ Apply sealer. <br /> <br />The turf was newly installed in 2020 and has a life expectancy of roughly 10-years. The turf has had limited use <br />due to COVID and seasonal high utilization since its installation. Sporturf modifications to be completed by <br />Becker Arena Products, Inc. include: <br />▪ All existing AT740 Sporturf to be cut at 12’ increments and rolled up. <br />▪ Existing Sporturf shipped to the manufacturer based in Georgia: <br />o Install Velcro strips to existing AT740 Sporturf seams and perimeter (glued application) <br />o Install Velcro strips to exterior concrete along perimeter (glued application) <br />▪ Sporturf shipped to FT Center from manufacturer. <br />Page 181 of 197
The URL can be used to link to this page
Your browser does not support the video tag.