Laserfiche WebLink
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Thomas Geiser — Operations Director <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />April 8, 2025 <br />6.1e <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />�14911IM191►1 <br />• Staff is working through the second round of maps for the new GIS mapping system that <br />we plan to move forward with in the future. Maps 1 through 60 are complete. <br />• The dehydration of the existing Cooper/Eaton switchgear is going well. <br />• Staff is still dealing with the lack of communication and action taken on the reclosers <br />that were recalled. We are waiting for all 30 of our units to be repaired at this time. <br />• ERMU received its new Vac-Tron and trailer the week of March 24. <br />• We are working on lining up projects for 2025 construction season. <br />Page 1 of 4 <br />219 <br />