My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4 SR 03-18-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
03-18-2024
>
7.4 SR 03-18-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 12:49:02 PM
Creation date
11/15/2024 12:49:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br />Elk - <br />River <br />To <br />City Council <br />Meeting Date <br />March 18, 2024 <br />Request for Action <br />Item Number <br />7.4 <br />Prepared By <br />Zack Carlton, Community Development Director <br />Item Description Reviewed by: <br />Conditional Use Permit: Allow Development of Cal Portner <br />Commercial Cannabis Cultivation Facility at 10700 Tina Allard <br />165th Avenue <br />Action Requested <br />Approve, by motion, a conditional use permit authorizing establishment of a commercial cannabis cultivation <br />facility along with the following conditions to satisfy the standards set forth in Sec. 30-654: <br />1. The facility must comply with all licensing and operating procedures required under Minnesota <br />Statutes Chapter 342. <br />2. The Conditional Use Permit may be issued prior to the applicant having received all necessary state <br />permits and licenses, but the applicant shall submit proof of obtaining all state permits prior to <br />beginning cultivation operations. <br />3. Issuance of this CUP does not exempt the applicant from all standards outlined in state statute. <br />4. The operation/building must connect to city sewer and water and pay the required SAC/WAC fees in <br />accordance with city codes. <br />5. Construction activities will require signed plans prepared by a qualified professional. <br />Background/Discussion <br />The property is zoned I I (Light Industrial) where Commercial Cannabis Cultivation facilities require a <br />Conditional Use Permit (CUP). This use was added to the city ordinances earlier this year and during the <br />ordinance review, the city has generally considered the use to be similar to a light manufacturing operation. <br />Vireo Health will utilize approximately 75,800 SF of the former GRE facility at 10700 165th Ave NW. The site <br />has largely been operated as a storage facility since GRE ceased operations on the property. The equipment <br />used by GRE has been removed, and the building is mostly vacant. The applicant will occupy a majority of the <br />building, which will require additional renovation and modifications. The entire site will also have onsite <br />security and 24/7 surveillance. <br />The proposal includes 8,000 sf of office space, 10,000 sf of storage and processing space, and 58,000 sf of <br />sealed cultivation rooms. Each cultivation room will have a positive -pressure HVAC system to minimize <br />cannabis odor. The cultivation rooms are also within the existing building, providing an additional barrier to <br />The Elk River Vision <br />A avelcoming community zvitb revolutionary and spirited resourcefulness, exceptional service, and community p p W E R E U A Y <br />engagement that encourages and inspires prosperity <br />229 <br />
The URL can be used to link to this page
Your browser does not support the video tag.