My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 06-04-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
06-04-2024
>
5.3 ERMUSR 06-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:46:26 AM
Creation date
6/3/2024 1:20:41 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River , <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Mike Tietz - Technical Services Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />June 4, 2024 <br />5.3 <br />SUBJECT: <br />Advanced Metering Infrastructure (AMI) Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />As of May 30, Allegiant has completed 136 residential water meter replacements and seven <br />retrofits. The pace is slower than anticipated due to staffing issues that Allegiant has been <br />experiencing, which also resulted in approximately 50 appointments having to be rescheduled. <br />We have been assured that Allegiant is in the process of filling this position and will be starting <br />their third technician at the end of May. <br />Staff has reviewed the commercial water meter appointment letter draft provided by Allegiant <br />and will be sending over revisions for final approval. An example of this commercial <br />appointment letter has been provided for your reference. Allegiant is still working on getting <br />another scheduling database setup for commercial services. I anticipate they will send out the <br />commercial appointment letter as soon as they have this database in place. <br />Another mailing of residential letters is expected to go out this week to approximately 1500 <br />residential customers. <br />Staff expects that Allegiant's subcontractor (Archer Plumbing) will begin commercial water <br />meter replacements beginning in June. Staff met with Allegiant, Archer Plumbing, and TKDA at <br />both Sportech locations to go over the details of the replacements. TKDA will be performing <br />spot inspections for us throughout this project. Sportech is scheduled to get their meters <br />replaced on June 6 which coordinated well with a shutdown that they already had planned for <br />their business. <br />We are still working with our distributor to develop a plan and commitment from the <br />manufacturer to provide us with an accurate shipment schedule for the electric meters. <br />ATTACHMENT: <br />• ERMU Commercial Water Meter Appointment Letter <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.