My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 04-09-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
04-09-2024
>
6.1g ERMUSR 04-09-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:37:00 AM
Creation date
4/10/2024 9:25:07 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River , <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Mike Tietz —Technical Services Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />April 9, 2024 <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• In March, the locators processed 243 locate tickets. These consisted of 205 normal <br />tickets, 5 emergency tickets, 21 updated tickets, 3 cancellations, 5 meets and 1 non - <br />excavation. This resulted in a 120.9% increase in tickets from the previous month and is <br />a 9.7% decrease from the prior March. <br />Electrical technicians completed 502 service order tasks, updated the power bill, <br />addressed customer meter issues and any off-peak concerns. <br />• The Advanced Metering Infrastructure (AMI) residential water meters and residential <br />electric meters continue to be installed in new services. The electrical technicians have <br />been busy changing out our Automatic Meter Reading (AMR) meters to AMI meters <br />around the system. We are still working through the initial setup processes with <br />Allegiant before we move into the mass meter deployment. We will continue to read <br />AMR meters via drive -by method until we have fully deployed all the AMI meters. <br />• For the month of March, staff did not run generators. <br />• One of my staff members returned to work on April 1, performing light duty tasks. <br />Great River Energy began utilizing their feeder tie with us on April 1, at the Station 14, <br />bank 3 substation. They have indicated that they plan to use this tie through the month <br />of May. <br />Page 1 of 1 <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.