My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Mike Tietz —Technical Services Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />March 12, 2024 <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• In February, the locators processed 110 locate tickets. These consisted of 91 normal <br />tickets, 3 emergency tickets, 8 updated tickets, 3 cancellations, 3 meets, 1 correction, <br />and 1 boundary survey. This resulted in an 18.3% increase in tickets from the previous <br />month and is a 34.1% increase from the prior February. <br />• Electrical technicians completed 535 service order tasks, updated the power bill, <br />addressed customer meter issues and any off-peak concerns. <br />• The Advanced Metering Infrastructure (AMI) residential water meters and residential <br />electric meters continue to be installed in new services. The electrical technicians have <br />been busy changing out our Automated Meter Reading (AMR) to AMI meters around <br />the system. <br />• The contract for meter installations has been reviewed by our legal team and fully <br />executed (attached). This was approved pending legal review at the February meeting. <br />We held our kick-off meeting on March 11 and are working through the initial setup <br />processes before we move into the mass meter deployment. <br />• Integrating National Information Solutions Cooperative with AMI continues to progress <br />as expected. We have resolved most of the identified issues and are currently utilizing <br />Meter Data Management for all AMI meter reads. We will continue to read AMR meters <br />via drive -by method until we have fully deployed all the AMI meters. <br />• For the month of February, staff did not run generators. <br />• One of my staff members will be out due to a medical procedure for approximately six <br />weeks. <br />• The substation apparatus technician has been working on preparing the physical design <br />package for East substation so that we can send this out for engineering review within <br />the next few months. <br />ATTACHMENTS: <br />• Allegiant Utility Services AMI Endpoint Installation Agreement - Executed <br />Page 1 of 1 <br />196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.