Laserfiche WebLink
>>>>STONE IMPROVEMENT PLAN 1.30.24020'10'5'N O R T HOPTION 1: REPLACE WITH NEW LIMESTONE1.REPLACE UN-DESIRED STONE WITH NEW IMPORTED STONE.2.INSTALL STONE WITH DRAINAGE ROCK AND OPTIONAL DRAIN TILEBEHIND AND CLEAR UNDER. SEE DETAIL.3.STOCKPILE WEATHERED STONE REMOVED FOR EXPORT ORRE-PURPOSE AS SHORELINE RIP RAP.4.REVIEW DRAINAGE BEHIND ALL EXISTING STONE RELATIVE TO THEORIGINAL PLANS THAT SHOWS DRAINAGE ROCK WRAPPED INFABRIC BEHIND ALL BLOCKS WITH A MAX OF 1" TOPSOIL. REMOVEANY EXCESS TOPSOIL AND REPLACE WITH DRAINAGE ROCK.OPTION 2 : REPLACE WITH CONCRETE LARGE BLOCK1.REPLACE UN-DESIRED STONE WITH CONCRETE LARGE BLOCK.2.INSTALL BLOCK ACCORDING TO MANUFACTURE RECOMMENDATIONS.3.STOCKPILE WEATHERED STONE REMOVED FOR EXPORT ORRE-PURPOSE AS SHORELINE RIP RAP.4.REVIEW DRAINAGE BEHIND ALL EXISTING STONE RELATIVE TO THEORIGINAL PLANS THAT SHOWS DRAINAGE ROCK WRAPPED IN FABRICBEHIND ALL BLOCKS WITH A MAX OF 1" TOPSOIL. REMOVE ANY EXCESSTOPSOIL AND REPLACE WITH DRAINAGE ROCK.STONE KEY2006 STONE LEFT IN PLACEPHASE 1 STONE INSTALLSPHASE 2 STONE INSTALLSINSPECT STONE(GREEN)MAIN SEATING AREA(PURPLE)M:\ELK RIVER\015-032 Rivers Edge Expansion CD phase one\5 Autocad\Stone replacement options\2023 elk river commons stone repairs.dwg, 1/30/2024 8:37:56 AM, DWG To PDF.pc3