My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 02-27-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2024
>
02-27-2024
>
5.1. PCSR 02-27-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2024 2:18:04 PM
Creation date
2/22/2024 2:16:36 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br /> <br /> <br /> <br /> <br /> <br />To Item Number <br />Planning Commission 5.1 <br />Agenda Section Meeting Date Prepared by <br />Public Hearings February 27, 2024 Zack Carlton, Community Development Director <br />Item Description Reviewed by <br />Venture Pass Partners, LLC – Randy Rauwerdink for Chris Leeseberg, Senior Planner <br />Spectrum Schools <br />Reviewed by <br /> Land Use Amendment, Case No. LU 24-01 <br /> <br /> Preliminary Plat of Elk River SBC Addition, Case <br />No. P 23-14 <br /> <br />Action Requested <br />Recommend, by motion, approval of the land use amendment <br />extending the Business Park and Public/Semi-Public land use <br />categories. <br /> <br />Recommend, by motion, approval of the Preliminary Plat of Elk River <br />SBC with the following conditions: <br />1. The City Council must approve the associated land use <br />amendment (LU 24-01) <br />2. The applicant and the city shall enter into an agreement <br />approving use of the proposed right-of-way as a driveway for <br />lot 2 and noting that the city will not maintain the right-of-way <br />until a city street is constructed to city standards which will be <br />required should the parcel develop into a use other than a <br />billboard in the future. <br />3. The right-of-way to be dedicated for use as a future street shall <br />meet all city design standards. <br />4. The city council must approve an easement vacation to support <br />the proposed lot configuration and right-of-way location. <br />5. All easements supporting the overhead electric lines shall <br />remain in place. <br />6. Any development within the easements for the overhead power <br />lines requires approval from the entity managing the <br />infrastructure. <br /> <br />Background/Discussion <br />The proposed subdivision includes two existing lots, one buildable and one outlot, which total 10.2 acres. One <br />lot is a vacant outlot without access to a public street, and the second includes Spectrum High School. The <br />parcels are also within two zoning districts. The current Spectrum High School lot is zoned BP - Business Park, <br />and the outlot is zoned I-1 – Light Industrial. <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br /> <br />service, and community engagement that encourages and inspires prosperity. <br />Updated: January 2023 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.