My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 08-08-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
08-08-2023
>
6.1g ERMUSR 08-08-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 8:41:55 AM
Creation date
8/17/2023 8:41:55 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Mike Tietz –Technical Services Superintendent <br />MEETING DATE: <br />August 8, 2023 <br />AGENDA ITEM NUMBER: <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br /> <br />DISCUSSION: <br />• In July, the locators processed 596 locate tickets. These consisted of 470 normal tickets, <br />7 emergency tickets, 87 updated tickets, 14 cancellations, 10 meets, 5 non-excavation, 1 <br />boundary survey, and 2 corrections. This resulted in a 9.1% decrease in tickets from the <br />previous month and is a 4.2% increase from the prior July. <br /> <br />• Electrical technicians completed 334 service order tasks, updated the power bill, <br />addressed customer meter issues and any off-peak concerns. <br /> <br />• In July, staff did not run the generators due to cooling water issues. <br /> <br />• The substation apparatus technician has been busy preparing drawings for the future <br />East substation project. Also, infrared scans of substation and line equipment found <br />several loose connections which were able to be corrected before they started causing <br />issues. Substation relays have all been updated to provide engineering control to be <br />able to remotely interrogate them. <br /> <br />• We received one of the two Ford Hybrid F-150s that were ordered in August of 2022. I <br />anticipate having the truck placed into service by the middle of this August. <br /> <br /> <br /> <br />99
The URL can be used to link to this page
Your browser does not support the video tag.