My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 08-07-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
08-07-2023
>
4.10 SR 08-07-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 4:40:15 PM
Creation date
8/3/2023 4:38:51 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br />To Item Number <br />Ma Tor and CinT Council 4.10 <br />Agenda Section Meeting Date Prepared by <br />Consent Agenda August 7, 2023 Tim Sevcik, Street and Park Superintendent <br />Item Description Reviewed by <br />Orono Boat Launch Dock Replacement ustin Femrite P.E., Public Works Director <br />Reviewed by <br />Cal Pormer, Ci r Administrator <br />Action Requested <br />Approve the Memorandum of Understanding (MOU) with the Minnesota Department of Natural Resources <br />(DNR) for a refurbished 5-foot byT 30-foot dock for the Orono Boat Launch. <br />Background/Discussion <br />During the spring installation of the Orono Park boat launch dock, staff noted several structural deficiencies <br />with the dock resulting in several repairs to be conducted. While repairs were able to make the dock safe for the <br />summer season, it was identified a replacement was needed. <br />Staff contacted the Minnesota Department of Natural ResouYces to inquire about the potential of the DNR to <br />provide a new dock as part of our parmership to offer access to the lake. DNR staff indicated theyT did not have <br />funding for any new docks for 2023, however they had several docks no longeY needed in their inventoryr. <br />After inspecting their excess docks, the DNR identified a 5-foot byr 30-foot ADA accessible dock with a wooden <br />surface that was structurally sound and in relatively good condition. The DNR agreed to provide this dock to the <br />cityT for use at Orono Park `vith the cityT to maintain the dock for public use. Some deck boards and bumper rail <br />replacements `vill need to be conducted byT cityT staff prior to installation. <br />Staff recommends entering a MOU with the DNR to replace the Orono Park boat launch dock for continued <br />use of the facilit�r. <br />Financial Impact <br />None <br />Mission/Policy/Goal <br />Provide continued services to the public in the most efficient and cost-effective manner. <br />Attachments <br />■ Memorandum of Understanding <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />rowEREo ar <br />�I'1 ���� <br />Update�l• January 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.