My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORD 23-11
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
2020 - 2029
>
2023
>
ORD 23-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 11:53:47 AM
Creation date
5/16/2023 2:16:47 PM
Metadata
Fields
Template:
City Government
type
ORD
date
5/15/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ver <br />Ordinance 23 - 11 <br />gtiikethretighs to be removed <br />Underlines to be added <br />An Ordinance Amending Chapter 66, Section 66-62, Streets, Sidewalks and Other <br />Public Places — Right -of -Way Delay Penalty of the City of Elk River, Minnesota, City <br />Code <br />The City Council of the City of Elk River does hereby ordain as follows: <br />SECTION 1. That § 66-62, Delay Penalty of the City of Elk River Code of Ordinances shall be <br />amended to read as follows: <br />In accordance with Minnesota Rules 7819.1000, subp. 3, and notwithstanding any provision of <br />this article, the city establishes a delay penalty for unreasonable delays in right-of-way excavation, <br />obstruction, patching, or restoration. A person shall be subject to a fee or penalty for violation of <br />this ordinance when an obstruction of the right-of-way exists beyond the date specified in the <br />permit, is performing non -emergency work in the right-of-way without having been issued a permit <br />or when a person causes the city to incur costs as a result of actions or inactions of a person. <br />A delay penalty will not be imposed in the discretion of the director for delays due to force <br />majeure, including inclement weather, civil strife, acts of God, or other circumstances beyond the <br />control of the permit holder. <br />The delay penalty for violation of this ordinance may be levied daily for as long as the violation <br />occurs. The amount of the delay penalty will be determined by the applicability of each specified <br />circumstance, which reflect unnecessary inconvenience and hazard exposure to the public: <br />Traffic Control. The permit holder shall, within 1 calendar day of completion of work, retrieve <br />all traffic control associated with the permit. Failure to remove any traffic control devices <br />from right-of-way shall result in a monetary penalty of $100 per day, up to seven days. If any <br />obstruction remains in right-of-way after seven days, city staff will remove the hazards and <br />notify the permit holder of their new location. <br />Collection. The permit holder will incur a fee for all staff and equipment hours utilized to <br />retrieve the hazards, calculated at a rate consistent with the most recent city fee schedule. <br />Storage. The permit holder will incur a fee of $100 per day for any hazards stored in city <br />facilities. <br />Restoration. The permit holder shall, within 1 calendar day of completion of work, perform <br />any necessary patching or restoration work as specified within the permit. Failure to correct <br />any damaged infrastructure within the right-of-way shall result in a monetary penalty of $200 <br />per day, up to three days. If after three days the hazard still exists, the city shall initiate <br />P 0 N E R E I I <br />NATURE <br />Last Updated January 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.