My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1i ERMUSR 03-14-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
03-14-2023
>
6.1i ERMUSR 03-14-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2023 9:00:43 AM
Creation date
3/13/2023 9:00:43 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br />TO: <br />ERMU Commission <br />FROM: <br />Dave Ninow – Water Superintendent <br />MEETING DATE: <br />March 14, 2023 <br />AGENDA ITEM NUMBER: <br />6.1i <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Delivered 15 new water meters. <br />• Sealed the water meter, installed an encoder receiver transmitter, and took curb stop <br />ties from 10 water services. <br />• Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br />• Completed 19 routine fluoride samples <br />o All samples met MDH standards <br />o Submitted MDH Fluoride Report <br />o Completed one MDH validation fluoride sample <br />• Submitted Discharge Monitoring Report (DMR) for the diesel generation plant to the <br />Minnesota Pollution Control Agency. <br />• Submitted Tier II Annual Reports to the Department of Homeland Security for the diesel <br />generation plant and all the water treatment plants. <br />• Routine maintenance and inspection of well #2 has been completed, the pump and <br />motor have been reinstalled, water quality testing done, and the well is now back in <br />service. <br />• Staff has been working with city staff on plans for the water main replacement and <br />street rehabilitation project that will occur in the School View neighborhood this <br />summer. <br />• The water operators have spent much of their time performing annual preventive <br />maintenance on the water treatment plants. <br /> <br /> <br />ATTACHMENTS: <br />• February 2023 Pumping by Well <br /> <br />258
The URL can be used to link to this page
Your browser does not support the video tag.