Laserfiche WebLink
Request for Action <br />To Item Number <br />Ma Tor and CinT Council 4.4 <br />Agenda Section Meeting Date Prepared by <br />Consent Februar�T 21, 2023 Ryan Sandhoefner, Engineer 1 <br />Item Description Reviewed by <br />Engineering Design Standards Updates ustin Femrite P.E., Public Works Director <br />Reviewed by <br />Cal Portner, Ci r Administrator <br />Action Requested <br />Approve, byT motion, the updated Engineering Design Standards. <br />Background/Discussion <br />The Engineering Design Standards weYe most Yecently updated in 2021 and weYe reviewed to ensure they continue <br />to reflect industryT standards for materials and construction practices for our public infrastructure. <br />The only material change is requirements related to grade adjustment riser rings for storm sewer and sanitaryT sewer <br />structures along with all related standard plates. The updates do not propose anyT modifications to our standard <br />street oY trail sections that would otherwise incYease development oY project costs. <br />We have also incorporated recommended changes and modifications provided by Elk River Municipal Utilities for <br />the watermain section of the standards. This section is included `vith our standards as the water sy stem is designed <br />and installed with the same engineer and contractor as the other public improvements in a t�rpical project. <br />Financial Impact <br />None. <br />Mission/Policy/Goal <br />OpportunityT to live, work, and play. <br />Attachments <br />■ Engineering Design Standards <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />rowEREo ar <br />�I'1 ���� <br />Up�iited.• August 2020 <br />