My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3a EMRUSR 10-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
10-11-2022
>
5.3a EMRUSR 10-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 2:40:15 PM
Creation date
10/12/2022 2:40:15 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ElkRiverMunicipalUtilities <br />2022UtilitiesFeeScheduleProposed2023ProposedIncrease <br />ELECTRIC <br />NewResidentialElectricConnectionDeveloperLotwithERMUwaterservice$475.00$975.00 105% <br />NewResidentialElectricConnectionDeveloperLotwithoutERMUwaterservice$575.00$1,475.00 157% <br />NewElectricConnectionBuilde <br />r$875.00$875.00 <br />NewWireFootagesover200'(perfoot)$4.00$4.00 <br />NewServiceFrostTrenching(perfoot)$5.00$5.00 <br />NewCommercial&IndustrialElectricConnection50%50% <br />ServiceUpgradesorAdditionsforExistingCustomers100%100% <br />MinimumTemporaryElectricServiceFeeExistingTransformer$220.00$220.00 <br />MinimumTemporaryElectricServiceFeeWithoutExistingTransformer$850.00$850.00 <br />StreetLight30'DecorativePolewith6'ArmandCobraFixture$2,700.00$2,700.00 <br />StreetLight23'DecorativePolewithCobraFixtur <br />e$1,800.00$1,800.00 <br />StreetLight14'DecorativePolewithCobraFixtur <br />e$4,100.00$4,100.00 <br />StreetLight14'DecorativePolewithAcornFixtur <br />e$5,300.00$5,300.00 <br />SecurityLightWoodPolewithFixture$975.00$975.00 <br />SecurityLightExistingPole$125.00$350.00 180% <br />PoleAttachmentFee(perpole)$6.50$15.00 131% <br />ManualMeterReadingFee(permonth)$10.00$10.00 <br />MeterInstallationFee(perindividuallymeteredapartmentunit)$20.00$22.00 10% <br />WATER <br />WaterAccessCharge=WaterConnectionCharge+WaterAvailabilityCharge$3,990.00$3,990.00 <br />WaterConnectionCharge(PerPlumbingUnit)Builder$3,600.00$3,600.00 <br />WaterAvailabilityCharge(PerPlumbingUnit)Developer$390.00$390.00 <br />$6,000.00 140% <br />AbandonedWaterService$2,500.00 <br />BackflowPreventerDeviceNonCompliance(permonth)$100.00$100.00 <br />Depositfor5/8"HydrantMeter$150.00$150.00 <br />Depositfor21/2"HydrantMeter$1,000.00$1,000.00 <br />HydrantWaterSalesRental(perweek)$50.00$50.00 <br />HydrantWaterSalesUnits(per1000gallons)$4.00$4.00 <br />HydrantWrench$40.00$40.00 <br />ManualMeterReadingFee(permonth)$10.00$10.00 <br />PrivateHydrantMaintenanceProgramMonthlyFee$5.00$5.00 <br />ADMINISTRATIVE <br />AdministrativeFeeforContinuedSubmissionofChecksAfterNoCheckNoticeGiven$20.00$20.00 <br />BillableCostofMaterialsMarkup15%15% <br />BillableLaborMarkup55%55% <br />BillableVehicle/Equipment(peremployeeperhour)$30.00$45.00 50% <br />CommericalApplicationFee$20.00$20.00 <br />ElectricServiceDisconnect/TripFeeMeterTechnician$50.00$50.00 <br />ElectricServiceDisconnect/TripFeeLineCrew$150.00$150.00 <br />WaterServiceDisconnect/TripFeeWaterOperator$100.00$100.00 <br />MeterTamperingFee$250.00$250.00 <br />MeterTestingFee$50.00$50.00 <br />NSFFee$20.00$30.0050% <br />PenaltyAmount10%10% <br />Photocopies(perpage)$0.25$0.25 <br />RedTagHandlingFee$20.00$20.00 <br />AdoptedbytheUtilitiesCommissiononNovember9,2021underauthorityperMinnesotaStatute412.361 <br />77 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.