My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1c ERMUSR 11-14-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
11-14-2017
>
6.1c ERMUSR 11-14-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2022 10:32:07 AM
Creation date
9/12/2022 10:32:07 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mark Fuchs—Electric Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 14, 2017 6.1c <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Had 18 new house services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • We have finished Miske Meadows 3rd Addition; the project consists of 17 residential lots. <br /> • We continue working in Connexus acquisition Areas 3&4. <br /> • Continue installing the infrastructure in Areas 5&6 heading north of the Waco substation. <br /> These two areas will be acquired in 2018. These areas will require more work because <br /> Connexus is keeping their feeder in these areas. <br /> • Continue rebuilding the overhead line south of 197th Avenue to 190 %2 Lane on the east <br /> side of Highway 169. Part of this line will be placed underground from 193rd Avenue to <br /> 190 '/2 Lane. <br /> • Timron Precision Gear needed to upgrade their service size, so we worked with them to <br /> move the three phase transformer to a better location and installed new primary wire. <br /> • Replaced a three phase overhead transformer bank with a pad mount transformer at <br /> Chippewa Innovation as we didn't have a spare overhead transformer if one would <br /> happen to fail. <br /> • Built a single phase overhead tap for the temporary service at Guardian Angels <br /> Riverview Landing. This building is located in north of Cowboy Jacks on Quantrelle <br /> Avenue in Otsego. <br /> • Working on moving three primary poles, a secondary pole, and installing a new three <br /> phase underground service for Exquisite Stone on Cleveland Street and Highway 10. <br /> • Installed a new single phase service for a billboard on Zane Street. <br /> • Installed the three phase transformer at the Sherburne County Courthouse.Need to make <br /> up the secondary side of the transformer once the electricians get their wires pulled in. <br /> • Zac Johnson, Mitch Girtz and Nick Hommerding attended Minnesota Municipal Utilities <br /> Association(MMUA) Overhead School October 17-20 in Marshall, MN. During the <br /> Overhead School, MMUA held their first annual Minnesota Lineworker Rodeo and Zac <br /> Johnson,Nick Hommerding and Curt Wark participated and Mitch Girtz helped out as a <br /> judge. Zac got third place in the hurt man rescue event. <br /> Page 1 of 1 <br /> 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.