My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.0 PRSR 08-10-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2022
>
08-10-2022
>
9.0 PRSR 08-10-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2022 10:16:30 AM
Creation date
8/5/2022 10:16:30 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
8/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br /> <br />To: Parks and Recreation Commission <br /> <br />From: Michael Hecker, Parks and Recreation Director <br /> <br />Date: August 10, 2022 <br /> <br />Subject: Director’s Report <br /> <br />This report is a monthly highlight of department activities related to recent collaborations, strategic <br />planning, staff changes/developments, and park operations. <br /> <br />Orono Park <br />We had a successful ribbon cutting/plaque dedication on a very hot day last Tuesday, August 2, 2022. The <br />Police Department Night to Unite event followed. The pavilion stone veneer and the pickleball court <br />fencing and surfacing work remains to be completed along with minor punch list items. <br />Splash pad and expanded beach users fill the parking lots on hot days. Unfortunately, the water pump <br />breakers trip sporadically, shutting it down and requiring maintenance to reset the system. <br />We have some spray head clogging issues, which requires daily maintenance, sometimes twice a day. The <br />wood chips around a splash pad was not a clever design idea. It has improved since we removed the <br />nozzle tips from the mist heads. We are currently collaborating with the vendor to get some type of a filter <br />screen on these lines to catch the smaller material prior to it reaching the spray heads. <br />Trott Brook Tennis Court <br />The Trott Brook tennis courts acrylic coating and striping was applied on Monday, August 1. Tennis <br />players were playing under the new LED lights later that day. The contractor will add a new acrylic <br />coating and striping to the park’s basketball court. <br />Rivers Edge Commons Park Dock <br />Installation was completed on Friday, July 29. It was popular during Elk RiverFest. Both anglers and <br />boaters are using it. We hope to have a dedication for the dock by the end of September. <br />WTRP Nature Play Area and Shelter Project <br />We have a follow up meeting scheduled with the general contractor. The general contractor and electrical <br />subcontractor are seeking a solution from the state electrical inspector. <br />Item: 9
The URL can be used to link to this page
Your browser does not support the video tag.