My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 07-12-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
07-12-2022
>
5.2 ERMUSR 07-12-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:34:15 PM
Creation date
7/12/2022 2:34:15 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River � <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Chris Kerzman — Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />July 12, 2022 5.2 <br />SUBJECT: <br />Field Services Facility Expansion Project Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Over the past month, the majority of the drywall has been installed on the second floor. The <br />remaining windows are waiting on site grading, which is currently being held up by concrete <br />installation. Garage doors arrived during the week of June 23, with multiple doors that will need <br />panels changed after installation, but they are being installed to secure the building. <br />Upcoming work for the next month is expected to include continued work in the upper level <br />such as drywall, painting, electrical installation, and plumbing fixtures. There are various <br />locations throughout the garage that need concrete issues addressed, but with garage doors <br />installed, the majority of work in the garage will be complete in July. Staff is expecting that we <br />will get a temporary certificate of occupancy near the end of the month to begin transferring <br />inventory. <br />Staff expects to present a verbal update on the initial structural steel contractor's default and <br />overall project schedule at the commission meeting. <br />Page 1 of 1 <br />:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.