Laserfiche WebLink
Request for Action <br />To <br />Item Number <br />Mayor and City Council <br />7.1 <br />Agenda Section <br />Meeting Date <br />1july <br />Prepared by <br />Public Hearings <br />5, 2022 <br />Chris Leeseber , Senior Planner <br />Item Description <br />Reviewed by <br />Conditional Use Permit: Expand a Track, Construct <br />Zack Carlton, Community Development Director <br />Roof Viewing Area, and Install Changeable Copy <br />Reviewed by <br />Sign, ERX Motor Park, 21591 Highway 169 <br />Cal Portner, City Administrator <br />Action Requested <br />Review the information received from Princeton and Elko New Market, and, <br />■ Council may approve, by motion, the CUP request along with the conditions noted in the May 16, <br />2022, staff report. <br />Or <br />■ If Council requires a sound study, the applicant will need to provide a written request for extension, <br />or Council must deny the CUP request during the July 18, 2022, regular meeting as there would not <br />be enough time to conduct one by July 26, 2022. <br />Background/Discussion <br />The Council postponed action on the Conditional Use Permit (CUP) at their May 16, 2022, meeting <br />requesting a sound study be completed. After that meeting, the applicant requested a work session with the <br />Council to discuss the expectations the Council had for the sound study. Discussion included where and <br />how often studies should occur along with the merits of a study. The applicant indicated there are five <br />events each year that generate most of the noise complaints. <br />After the Council discussed the merits of conducting a sound study, they directed staff to research other <br />racetracks in the state. Staff reached out to Princeton Speedway and Elko Speedway and Drive-in Theater <br />and have included information received from those two operations. <br />Princeton Speedway has no mitigation measures in place, other than a curfew (similar to CUP standards for <br />ERX) and Elko Speedway stated a noise assessment was conducted in 2005 and was associated with some <br />platting and development of the track property. The noise study is included in the attachments and staff <br />contacted the consultant that completed the investigation. They noted that a similar study could be turned <br />around in 2-3 weeks upon completion of collecting the desired readings. The overall timeline would depend <br />on how often data is expected to be taken. The consultant indicated a rough ballpark estimate would be <br />$5,000-10,000, noting it will depend on many factors. <br />Per state statue, the city must act on this item by July 26, 2022, unless the applicant requests in writing the <br />60-day rule be waived. <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional service,,` 01 e <br />and community engagement that encourages and inspires prosperity INAWRE1 <br />