My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.11 SR 06-06-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
06-06-2022
>
4.11 SR 06-06-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2022 12:30:39 PM
Creation date
6/2/2022 1:58:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br />To <br />Item Number <br />Mayor and Ci r Council <br />4.11 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Consent <br />June 6, 2022 <br />Ryan Sandhoefner, Engineer 1 <br />Item Description <br />Reviewed by <br />Accept Proposal for the Construction of 13 <br />Justin Femrite P.E., Public Works Director <br />Reviewed by <br />Lights along the Highway 10 Trail <br />Cal Portner, City Administrator <br />Action Requested <br />Approve, by motion, the quote to authorize Design Electric Inc. to construct 13 trail lights between Gary Street and <br />the western limits of the Lake Orono bridge. <br />Background/Discussion <br />As part of the federal grant received for the construction of the Highway 10 trail, lighting was a component that was <br />to be included along the full length. The lighting installed last year, with the MnDOT TH 10 reconstruction project, <br />was confined to the limits of the MnDOT project which stopped on the east side to the Lake Orono Bridge. The <br />remaining segment to finish the lighting system west of the bridge to Gary Street was intended to be done locally <br />(and is part of our planned local cost share for the overall pro)ect). To complete this element, 13 additional trail <br />lights are included in the attached quotation. The style and spacing of the lights is consistent with the existing lights <br />on the east side of the bridge. <br />Two quotes were obtained ranging from $92,377.06 to $103,878.50. Staff recommends acceptance of the low quote <br />submitted by Design Electric Inc. in the amount of $92,377.06. <br />Financial Impact <br />The local cost share for the TH 10 Trail project as include in the CIP, was detailed to come from the Park <br />Dedication fund. <br />Mission/Policy/Goal <br />Opportunity to live, work, and play. <br />Attachments <br />Design Electric - Quote <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires pi ospei ly. <br />M <br />TUREJ <br />Updated.• August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.