My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1j ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
6.1j ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:47:15 PM
Creation date
12/13/2021 3:47:15 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Dave Ninow—Water Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 14, 2021 6.1j <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Delivered thirteen new water meters. <br /> • Sealed the water meter, installed an encoder receiver transmitter, and took curb stop <br /> ties from eleven water services. <br /> • Completed 15 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria <br /> o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> • Completed 19 routine fluoride samples <br /> o All samples met MDH standards <br /> o Submitted MDH Fluoride Report <br /> • The planned routine maintenance and inspection of Well 8 has been completed. The <br /> drop pipe, check valve, pump, and motor have been reinstalled. The well is back in <br /> service. <br /> • A risk and resilience assessment for the Elk River water system has been completed and <br /> an emergency response plan was developed. The America's Water Infrastructure Act <br /> required this process to be completed by the end of 2021. <br /> • We have drained Auburn Street Water Tower for the winter. During winter the tower is <br /> subject to ice buildup on top of the water, which is extremely damaging to the structure <br /> and paint. We will wash and refill the tower in the spring. <br /> • The water operators have started annual maintenance of the water treatment plants. <br /> This process includes inspecting and recharging the iron and manganese removal <br /> pressure filters. <br /> • We have once again placed protective plastic bag on some of the fire hydrants to <br /> protect them from corrosion from road salt. <br /> • There has not been an agreement reached for the final cost of the County Road 13 <br /> water main relocation/insulation work. Staff will continue discussions with the contactor <br /> to reach a fair cost to ERMU for the work to be performed. <br /> ATTACHMENTS: <br /> • Pictures—Maintenance of Well 8 <br /> • November 2021 Pumping by Well <br /> Page 1 of 1 <br /> 153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.