My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
6.1g ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:45:40 PM
Creation date
12/13/2021 3:45:40 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Thomas Geiser—Operations Director <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 14th, 2021 6.1g <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Staff continues to meet with WSB Engineering and MnDOT for the upcoming Highway <br /> 169 Redefine project. Permits have been approved and we are in full construction <br /> mode. We are working with Great River Energy, as they had nine poles along the <br /> highway that need to be moved or replaced and we have three phase overhead lines <br /> attached to them. The last pole was moved on December 7. All underground lines are <br /> installed and energized at 197th and 193rdavenues, as well as School and Main streets. <br /> Crews will tear down overhead infrastructure as needed this winter. We will have to <br /> replace 700 feet of 500 MCM underground line along the ramp that brings Highway 10 <br /> westbound to Highway 169 northbound. That will be done in the spring. <br /> • We have been meeting with staff from Sherburne County to plan for work that needs to <br /> be done for the County Road 44 project. <br /> • All the streetlights that had to be removed during the Highway 10 rehabilitation project <br /> are reinstalled and functioning. <br /> • Staff is working on the electric department's budget for 2022, looking at equipment and <br /> materials needed for the developments and projects that are known to be taking place <br /> in 2022. <br /> • I will be participating in interviews over the next couple weeks to fill the journeyman <br /> lineworker and customer service manager positions. <br /> • Staff has had meetings with the City and Arvig about the fiber optic loop system which <br /> will connect Highway 169, Fire Station 3, Main Street, and County Road 12. <br /> • We are working with the City on extending the trail lights along Highway 10 to <br /> eventually go from the bridge to Gary Street. ERMU would be responsible for installing <br /> the pipe and bases. <br /> • Staff is working with the City of Otsego and a developer on bringing power to a <br /> development that is in ERMU's service area but quite some distance from our <br /> infrastructure. <br /> Page 1 of 1 <br /> 149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.