My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 ERMUSR 08-10-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
08-10-2021- SPECIAL
>
5.4 ERMUSR 08-10-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 2:43:46 PM
Creation date
8/9/2021 2:43:46 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/10/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Chris Kerzman – Engineering Manager <br />MEETING DATE: <br />August 10, 2021 <br />AGENDA ITEM NUMBER: <br />5.4 <br />SUBJECT: <br />Field Services Facility Expansion Project – Award and Assign Construction Contract <br />ACTION REQUESTED: <br />Adopt resolution 21-15, Awarding and Approving the Assignment of Construction Contract to <br />RJM Construction. <br /> <br />BACKGROUND: <br />The original contractor for the steel supply defaulted on their contract, so RJM is working <br />directly with the original joist supplier for the roof joists and decking. The structural steel for <br />area A, which includes the office and lunchroom portion of the building, was awarded at the <br />July commission meeting. Area B, which includes structural steel for the garage, inventory <br />maintenance, and wash bays, was advertised for bids on July 17. <br /> <br />DISCUSSION: <br />Bids for the Area B structural steel and miscellaneous metals are being opened on August 9 at <br />1:00 PM. RJM will be in attendance to evaluate the bids and to provide a recommendation at <br />the commission meeting. <br /> <br />Staff expects to provide handouts of Resolution 21-15, a bid tabulation, and letter of <br />recommended award at the meeting. <br /> <br />Staff recommends waiting until the September or October commission meeting to discuss any <br />additional contingency costs. We would like to have a better understanding of the earthwork <br />and underground utilities, as well as get further into budgeting for 2022, to make a good <br />decision. <br /> <br />Contractors are making good progress on the construction, with both foundation installation <br />and underground utilities scheduled to start during the week of August 9. There have been a <br />few issues that the earthwork contractor ran into, including an old fuel tank and dump site that <br />are both being analyzed by an environmental contractor. The feeder wire that was hit by an <br />excavator was switched to another feeder quickly and repaired the same day. RJM expects that <br />the next month will focus on foundation installation and underground utilities, with pre-cast <br />walls arriving in mid-September. <br />86
The URL can be used to link to this page
Your browser does not support the video tag.