______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Mike Tietz –Technical Services Superintendent <br />MEETING DATE: <br />July 13, 2021 <br />AGENDA ITEM NUMBER: <br />6.1i <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br /> <br />DISCUSSION: <br />• In June, the locators processed 675 locate tickets. These consisted of 3 emergency <br />tickets, 567 normal tickets, 1 non-excavation ticket, 5 boundary surveys, 2 corrections, <br />68 updated tickets, 13 cancellations, and 16 locate meets. This resulted in a 17.2% <br />increase in tickets from the previous month and an 5.2% decrease from the prior year. <br /> <br />• Electrical technicians completed 271 service order tasks, updated the power bill, <br />attended to customer meter issues and off-peak concerns. <br /> <br />• On June 29 & 30, staff worked with Cooper Machinery Services on troubleshooting <br />Engine #3’s excessive smoking issues. Four fuel injectors had to be replaced with <br />injectors in our inventory. We will test the remaining 12 fuel injectors as those that <br />failed are rebuilt. Staff also replaced inspection cover gaskets for Engines #1 & #2. <br /> <br />• Mapping department continues to work on implementing mPower Integrator software. <br /> <br />• The substation apparatus technician identified a loose connection on the A-phase of the <br />circuit switcher of Waco Bank #1 during his weekly inspection. We were able to get this <br />connection repaired before it caused any problems. See attached report. <br /> <br />• Some additional grading work was done at the West Substation garage site by Wruck <br />Excavating to facilitate the drive through loading of equipment. <br /> <br />• Connexus Energy utilized their feeder out of the North Substation on June 5 for about <br />4.5 hours due to an outage at their Zimmerman substation. <br /> <br />• With the hot weather in early June, we reached a new system peak of 77.2 MW. <br /> <br />ATTACHMENTS: <br />• IR Inspection Report – Waco Substation Bank #1 <br />129