My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1.4 ERMUSR 05-11-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
05-11-2021
>
1.4 ERMUSR 05-11-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 2:21:31 PM
Creation date
5/7/2021 2:21:31 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Mike Tietz – Technical Services Superintendent <br />MEETING DATE: <br />May 11, 2021 <br />AGENDA ITEM NUMBER: <br />1.4 <br />SUBJECT: <br />American Public Power Association 2020 Certificate of Excellence in Reliability <br />ACTION REQUESTED: <br />Receive the American Public Power Association 2020 Certificate of Excellence in Reliability <br /> <br />BACKGROUND \ DISCUSSION: <br />The American Public Power Association (APPA) recently honored 187 public power utilities with <br />a "Certificate of Excellence in Reliability" for reliable performance. These utilities have <br />significantly outperformed the electric industry nationwide averages as gathered by the Energy <br />Information Administration. APPA collected data from nearly 509 public power utilities that <br />track their reliability data via the eReliability Tracker. Of those utilities, 272 were considered to <br />have sound data that was included in the 2020 Annual Benchmarking Report. <br /> <br />The tracker performs calculations for System Average Interruption Duration Index (SAIDI) which <br />measures the average outage time per customer on the system, System Average Interruption <br />Frequency Index (SAIFI) which measures how often a customer on our system could expect to <br />experience an outage, and Customer Average Interruption Duration Index (CAIDI) which <br />measures averaged outage duration of all customers that actually experienced an outage. <br />The report also includes calculations for Momentary Average Interruption Frequency Index <br />(MAIFI) and Average Service Availability Index (ASAI) which helps utilities to compare, collect, <br />categorize, and analyze their outage information. <br /> <br />For 2020, ERMU’s SAIDI was only 15.8 minutes (excluding major events), compared to the <br />industry average of 139 minutes (excluding major events). In simple terms, it means that <br />averaged out over our 12,604 electric customers, each customer could expect to have a total <br />outage time that is 123 minutes shorter than the national average. <br /> <br />I would like to recognize the Elk River Municipal Utilities team for continuing to provide our <br />customers with exceptional electric reliability in 2020. The hard work of these dedicated people <br />exemplifies ERMU’s Vision to “Provide exceptional services and value to those we serve.” <br /> <br />ATTACHMENT: <br />• APPA 2020 Certificate of Excellence in Reliability <br />2
The URL can be used to link to this page
Your browser does not support the video tag.