My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMU RES 21-7
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Resolutions
>
2021
>
ERMU RES 21-7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 3:28:24 PM
Creation date
4/16/2021 3:28:23 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. 21-7 <br /> BOARD OF COMMISSIONERS <br /> ELK RIVER MUNICIPAL UTILITIES <br /> A RESOLUTION OF THE BOARD OF COMMISSIONERS OF ELK RIVER MUNICIPAL <br /> UTILITIES AWARDING BIDS AND QUOTES FOR THE ELK RIVER MUNICIPAL UTILITIES <br /> FIELD SERVICES FACILITY PROJECT <br /> WHEREAS, Elk River Municipal Utilities (ERMU) have worked with Kodet Architectural <br /> Group and RJM Management (RJM) on the design plans, construction documents, and <br /> bid documents for the ERMU Field Services Facility Project; and <br /> WHEREAS, on February 9, 2021, the Utilities Commission authorized the advertisement <br /> for bids and quotes for the ERMU Field Services Facility Project; and <br /> WHEREAS, bids were received, opened, and tabulated according to law on March 24, <br /> 2021; and <br /> WHEREAS, a total of 170 bids and quotes were received for the project; and <br /> WHEREAS, RJM have reviewed all of the bid documents and quotes and determined <br /> them to meet all responsible bidder requirements and is recommending the award of <br /> the contract for each of the bid and quote categories listed below: <br /> BID CATEGORY COMPANY AWARD AMOUNT <br /> 3A-Cast-In-Place Concrete Ultra Concrete $735,700.00 <br /> 3B-Precast Structural&Arch.Concrete Molin Concrete Products Co. $1,609,149.00 <br /> 4A-Unit Masonry Steenberg-Watrud Construction $293,852.00 <br /> 5A-Structural Steel&Misc.Metals-Materials Thornberg Steel,Inc. Previously Awarded <br /> 5B-Structural Steel&Misc.Metals-Erection Amerect Inc. $217,300.00 <br /> 6A-Carpentry Kellington Construction, Inc. $106,500.00 <br /> 7B-Metal Panels&Metal Roofing Lake Area Roofing&Construction,Inc. $212,426.00 <br /> 7C-EPDM Roofing Lake Area Roofing&Construction,Inc. $414,314.00 <br /> 8A-Doors,Frames&Hardware-Materials Twin City Hardware Company $111,081.00 <br /> 8C-Storefront&Glazing Systems Envision Glass $189,700.00 <br /> 9A-Gypsum Board Assemblies RTL Construction $326,033.00 <br /> 21A-Fire Suppression Systems Summit Fire Protection $103,600.00 <br /> 22A-Plumbing Systems Weidner Plumbing&Heating Co. $655,000.00 <br /> 23A-HVAC Systems SCR,Inc. $759,500.00 <br /> 26A-Electrical Systems Wolf River, Inc. $672,588.00 <br /> 31A-Earthwork Nord Excavating $859,000.00 <br /> 32A-Asphalt Paving Northland Paving $306,000.00 <br /> 32B-Concrete Paving North Country Concrete, Inc. $137,550.00 <br /> 1133A-Utilities Kevitt Companies $428,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.