My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 03-15-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
03-15-2021
>
7.1. SR 03-15-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2021 2:15:58 PM
Creation date
3/12/2021 9:23:51 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it ci <br />Elk* <br />River <br />Request for Action <br />To <br />Item Number <br />Mayor and City Council <br />7.1 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Hearings <br />March 15, 2021 <br />Chris Leeseberg, Senior Planner <br />Item Description <br />Reviewed by <br />Conditional Use Permit: Expand Light <br />Zack Carlton, Planning Manager <br />Manufacturing Use, 10752 168th Circle <br />Reviewed by <br />Cal Portner, City Administrator <br />Action Requested <br />Approve, by motion, the Conditional Use Permit upon the condition <br />that the applicant records an ingress/egress easement providing access <br />for PID 75-011-3400, in order to satisfy the standards set forth in _ <br />Section 30-654. j <br />Background/Discussion U <br />The property is zoned FAST Subzone H where light manufacturing <br />facilities require a Conditional Use Permit (CUP). <br />The applicant seeks a CUP to construct an approximately 90,000 sf RR <br />addition to their existing 105,000 sf light manufacturing facility. <br />Hwy 10 <br />The project meets the exterior design standards (precast concrete <br />panels with a ribbed pattern matching the existing color) for the FAST <br />- Subzone H zoning district and includes 82 trees which complies with <br />the city's landscaping standards. <br />The setback and parking standards are satisfied under the submitted <br />proposal. Access to the site will occur at three points along 168`h Ave. <br />The loading dock doors are located along the south side of the <br />Figure I <br />structure, opposite public streets. <br />CR 33 <br />CR 12 _ <br />Planning Commission Meeting <br />No one spoke for or against the request during the public hearing, and the Planning Commission unanimously <br />recommended approval of the request. <br />Financial Impact <br />None <br />The Elk River Vision P I I E I E U I Y <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional [NATURE] <br />service, and community engagement that encourages and inspires prosperity. Updated. August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.